1、

Setting for construction joint in large equipment foundation

大型设备基础施工缝的设置

互联网摘选

2、

Calculation and research on influence of dam strength by vertical construction joint grouting

施工纵缝灌浆措施对坝体强度影响计算研究

互联网摘选

3、

Treatment of the quality defects of construction joint of pool

水池施工缝质量通病的防治

互联网摘选

4、

Study of elastic concrete properties and their application to construction joint of bridge

弹性混凝土性能研究及在桥梁伸缩缝工程中的应用

互联网摘选

5、

Analysis on Crack Cause and Treatment of Horizontal Winter Construction Joint

观音阁水库混凝土大坝越冬面水平施工缝的开裂原因及处理措施

互联网摘选

6、

Horizontal construction joint shall be set at the top of the slab.

5施工缝留设:水平施工缝留置于板顶面.

互联网摘选

7、

The setting and treatment of construction joint in concrete work

混凝土工程施工缝留置及处治

互联网摘选

8、

Treatment method of construction joint in reinforced concrete structure

钢筋混凝土结构施工缝处理方法的探讨

互联网摘选

9、

To solve the problem, the welding joint construction was re-designed and argon-arc welding was employed.

解决措施为采用氩弧焊,改进焊接结构设计等。

互联网摘选

10、

Joining "the United Nations Counter-corruption Joint pledge" and strengthening the international cooperation step, our country also sped up the law construction advancement, the Law of Criminal Procedure revision and the consummation is also just around the corner.

随着我国加入《联合国反腐败公约》、进一步加强与国际合作的步伐,我国也加快了法治建设的进程,刑事诉讼法的修改和完善也指日可待。

互联网摘选

11、

On the base of kangaroo's biological construction, this paper developed a complaisant hopping model, than analyzed how nonlinear joint and complaisant foot work and improve the hopping capability of system.

为此,本文从袋鼠生物柔性结构研究出发,建立了仿袋鼠柔性跳跃机构模型,并研究了仿生非线性柔性关节和柔性脚的模型和力学机理以及对系统跳跃运动性能的影响。

互联网摘选

12、

Discussion on the Rebuilding and Construction Quality Control of Dilatation Joint of High Way

浅谈公路桥梁伸缩缝改造施工质量控制

互联网摘选

13、

The foundation with a tie beam concrete casting, does not keep the construction joint continually.

与系梁混凝土浇筑的基础,不留施工缝不断。

互联网摘选

14、

In this paper, the fabrication of intermediate joint, selection of crimping tool, construction procedure and difficult point in technique are introduced in detail.

本文详细介绍了中间接头的制作,压接工具的选择,以及其施工方法与技术难点。

互联网摘选

15、

The structural type of T-joint and angle joint in construction steel structure were expounded, the test characteristics of these structural type were explored, and the key point of control and test method for detecting flaw by supersonic was proposed in this paper.

本文论述建筑钢结构T型接头及角接接头的结构型式,探讨了这种结构型式的检测特点,提出了用超声波探伤的检测方法及控制要点。

互联网摘选

16、

Construction technology for cold transverse joint of asphalt road

浅谈沥青混凝土路面横向冷接缝施工技术

互联网摘选

17、

On the basis of in-depth analysis and study on early distress of asphalt concrete road surface, depending on a great deal of construction experience, the author audaciously experiments with new method of setting expansion joint on water-stabilization bases and acquires expected effect.

笔者通过大量的施工经验,在深入分析、研究沥青砼路面早期病害的基础上,大胆尝试水稳基层设置伸缩缝的做法,并取得理想效果。

互联网摘选

18、

In design, the aseismic joint can't be set at the entrance of the stairway, and the concept design and the construction measure of the stairway and staircase should be strengthened in structural systems.

在设计中,防震缝不宜设在楼梯间的出入口门洞处,在不同的设计体系中都应加强楼梯和楼梯间结构的概念设计和构造措施。

互联网摘选

19、

Super sized flat ground in which soft joint is adopted can be concreted by one time without reserving construction joints.

大面积厚地坪采用软缝,可一次浇筑不留施工缝;

互联网摘选

20、

Synchronously, some design advices about the beam-column joint and construction are put forward.

同时, 还对加固中节点的设计及施工方法提出了一些简单的建议.

互联网摘选

  • 今日热词
  • 热门搜索

简答网英语词典(dict.jiandongshicai.cn)为您提供在线翻译英语词典单词大全英译汉汉译英等英语服务!可按单词字数词义分类查询。支持lj:关键词格式查询例句。

用户反馈
请选择反馈类型(可多选):
您的联系方式:(如需回复请填写联系方式)
反馈内容:
提交成功 小编会尽快处理
回到顶部
点击反馈